PU Tire Production Process Control


1. Monitoring of machine proportion; Test the ratio of A: B  materials twice a day; 

2. Monitoring of material density: The pu material density shall  be tested once every 2 hours;

3. Inspection of pu tire weight and hardness in  process; Sampling inspection shall be conducted every 1 hour;

PU Tire's Hardness

4. Cleaning and replacement of machine head; Replace the  mixing blade every 4 hours and clean the machine head once;

5. PU tire mold cleaning: Clean the tire mold once a day to ensure the appearance quality of the pu tire;

6. Cup foaming test must be carried out for each feeding;

Cup foaming test

7. The apperance inspection of pu tire per mold must be carried out when  trimming; Every mold must be cleaned when  removing it.