We strictly control our product quality during the whole production process from the raw material to the finished products.
---------------------------------Material Control-------------------------------------
A. PU Material

2. Incoming inspection:For every lot of incoming material,we random check its quality by cup foaming.
B. Rubber tire

2.Incoming inspection: physical checking including yellowing,damage and deformation etc.
C. Accessories
2. Incoming spection: we need to check coating fastness,size and physical appearance;Reliability test includes tensile strength,impact strength and salt spray resistance etc.

--------------------------------Production Preparation------------------------------
2.Conservatory baking: store the air filled tires for 24 hours in the conservatory under the temperature of 50-60 degree .
B. Recipe Configuration
Weigh,blend and stir well several chemial materials to get the appropriate recipe.
C. Mould Preparation
2. PU Tire moulds: it is nessossary to make sure the tread is correct during the clearance and installation process.

--------------------------------Production --------------------------------------------
2. After the proportion of the compounds is ok, we start the cup foaming and test the foam density;
B. First inspection
C. Self test
2. The finished product needs to be trimmed, and self-check to confirm whether the appearance of the product meets the quality requirements. After confirming the quality, it is necessary to brand the production batch code, so that each product can be traced.

------------------------------Semi finished Product--------------------------------
B. Tires to be assembled
After being placed for 48 hours,the products can enter the assembling process.
------------------------------Finished Product--------------------------------
2. Assembling: Assemble the tire according to the standard requirements of the filled tire assembly;
3. Finished product: The finished product needs to be tested for side impact and runout; after passing the test, it can be cleaned and packed.

B. PU Wheels
2. Assembling: Assemble the tire according to the requirements of the PU tire assembly standard;
3. Finished product: The finished product needs to be tested for side impact and runout; after passing the test, it can be cleaned and packed.